Kitchen progresses – Electricians are back

Progress on a daily basis on the kitchen!  Yeah!  Things are being finished and some long-awaited items are finally installed.

The Story of February 17th, in pictures . . . . . . . .

The pantry is completely installed — almost — two of the doors cracked after being finished, have been remade, and will be refinished and installed (note there are also now knobs on the doors) . . . .

The sub zero is “almost” invisible behind its cabinet doors.  A cherry panel will be installed in place of the black grate at the top . . . .

The lighting rail above the island — I would say it is my favorite thing because of the red hand blown pendants, but the whole kitchen is turning out to be a beautiful (favorite) thing . . . .

And don’t worry, we are not nuts – the stained glass lamp at the ceiling to the right will be at the correct height over the oak table — it’s just tied up out of the way of the construction right now.  And the light hanging down from the ceiling behind the rail is waiting on a replacement part – it will disappear into the ceiling as soon as it can.